The project, awarded by Aena, involved rehabilitating the pavement on Runway 13/31 and its entrance and exit taxiways. To accommodate airport operations, the work was carried out over two winter seasons.
SAMPOL’s scope included replacing the runway’s visual aids with LED technology and upgrading taxiway lighting and signage. Technical noncompliance issues at airfield turns were also addressed by adding paved widening sections and modifying the associated signage and markings.
During the 2022–2023 season, primary cabling for the visual aid circuits was installed through a new duct bank, and the circuits were transferred to the new infrastructure. High-speed exit taxiways E-1 and E-6 were upgraded with LED visual aids to allow use in both directions and were equipped with stop bars.