Transport
2021–2023
Tenerife, Spain
Integrated MEP & Technology Systems Contracting
SAMPOL upgraded the HVAC system at Tenerife South Airport by replacing eight of the ten chillers serving the terminal. The scope included installing eight Trane RTAF G 275 chillers, building a new chilled water distribution loop, and installing all pumps required to operate the system.
The project also included replacing air handling units CL036 and CL037, adding supplemental units CL036B and CL037B, completely replacing the ductwork in the boarding area, and installing solar control film on the arrivals façade. Five new mechanical rooms were built to distribute chilled water, interconnected by a 400-meter-long DN400 supply and return loop.
The installation included more than 4 kilometers of steel piping and required 400-metric-ton cranes to lift chillers weighing more than 8.5 metric tons at reaches exceeding 70 meters.
All work was carried out without disrupting airport operations.