SAMPOL features in a report published by Canarias7 on its Los Realejos plant. According to the Canary Islands Government’s Minister for Energy, Mariano Hernández Zapata, speaking in the Parliament of the Canary Islands, the facility helped prevent the incidents recorded in early November from leading to a total blackout in Tenerife.
A facility for exceptional situations
Emergency plants address the electricity generation deficit that Red Eléctrica has been warning about since 2021, which stands at 268 megawatts in the Canary Islands, 80 of them in Tenerife. They are activated exclusively by the electricity system operator, which turns to them once all the other conventional generation units available on the island are already running.
Emergency plant · Los Realejos
Engineering and a great team
Behind every facility there is engineering, commitment and, above all, a great team of people. With the Los Realejos plant, SAMPOL helps strengthen the reliability and security of electricity supply in Tenerife, providing additional generation capacity for exceptional situations.
Source: Canarias7 / Efe, 12 November 2026.


