Hospitality
2025 – 2026
Santa Cruz de Tenerife, Spain
Integrated MEP & Technology Systems Contracting
The project involved upgrading the low-voltage electrical, fire detection, and telecommunications systems at Hotel Barceló Contemporáneo to meet the property’s new operational and technological requirements. The scope included a complete overhaul of the electrical and communications infrastructure while preserving the building’s exterior appearance throughout construction.
Technology upgrades included installing the ICOSAEDRO system in guest rooms, adding new control and management capabilities to optimize hotel operations. Construction was completed in December 2025, and the hotel opened following testing and commissioning of the building systems.