Hospitality / Digitalization and Automation
2026
Boa Vista Island, Cape Verde
Engineering and Design / Integrated MEP & Technology Systems Contracting / Control and Automation Integration
The full refurbishment of the Occidental Boa Vista Hotel will be carried out in three phases, allowing the resort to remain open during the work. The hotel will expand from 300 to 517 rooms, and its common areas will be renovated.
SAMPOL designed and carried out the integrated installations for the refurbishment of the new Barceló hotel on Boa Vista Island. The work covered medium- and low-voltage electrical systems, HVAC, fire protection, drainage, plumbing, and telecommunications.
A PON network will be installed to support services such as Wi-Fi and IPTV. Guest rooms will feature the Ico PRES solution, including magnetic contacts on balcony doors that adjust the air-conditioning operation when the doors are open and help optimise energy consumption.