Engineering and Design / Integrated MEP & Technology Systems Contracting / EPC — Engineering, Procurement & Construction / Energy / PPA / Energy as a Service
Power and heat generation for the Janssen pharmaceutical plant in Gurabo
Janssen’s 6.75 MW Behind-the-Meter industrial microgrid, part of Johnson & Johnson, was commissioned in 2024 in Gurabo, Puerto Rico. It was designed to supply the plant’s pharmaceutical processes and ensure continuity of power supply in the event of disruptions to the public grid. The microgrid normally operates in parallel with the grid and can switch to island mode if external power is completely lost.
The plant includes two natural gas reciprocating engines and a 2 MW / 1 MWh BESS. The storage system complements the high-efficiency generation and strengthens supply stability. SAMPOL was responsible for the design, investment, full EPC delivery, and operations and maintenance (O&M) under a PPA / Energy-as-a-Service (EaaS) contract.
Steam and hot-water production with four days of LNG autonomy
Heat recovered from the engines is used to produce 3.2 t/h of steam and 2.5 MWth of industrial hot water, using heat from power generation to meet the plant’s thermal needs.
The 250 m³ LNG storage and regasification infrastructure provides four days of fuel autonomy and strengthens the installation’s security of supply.