Logo Sampol Bn 02 2
  • HOME
  • SAMPOL’S COMMITMENT
  • PROJECTS
  • TALENT
  • ABOUT SAMPOL
  • NEWS
  • CONTACT
  • English
    • Spanish
Logo Sampol Bn 02 2
Logo Sampol Bn 02 2
  • HOME
  • SAMPOL’S COMMITMENT
  • PROJECTS
  • TALENT
  • ABOUT SAMPOL
  • NEWS
  • CONTACT
  • English
    • Spanish
Logo Sampol Bn 02 2
  • HOME
  • SAMPOL’S COMMITMENT
  • PROJECTS
  • TALENT
  • ABOUT SAMPOL
  • NEWS
  • CONTACT
  • English
    • Spanish
Balizamiento De La Pista 16l 34r Del Aeropuerto Internacional Jorge Chávez

Airfield Lighting for Runway 16L-34R at Jorge Chávez International Airport

sector:

Transport

date:

2025 – 2026

Location:

Lima, Peru

Services:

Integrated MEP & Technology Systems Contracting / Digitalization and Automation

Installation of a Complete CAT III Visual Aids System

The project involved removing existing systems and installing new visual aids for Runway 16L-34R and its associated taxiways. The scope included 2,251 lights, 37 constant current regulators, four high-voltage selectors, two precision approach path indicator (PAPI) systems, a CAT III approach lighting system, threshold identification lights, sequenced flashing approach lights, internally illuminated airfield guidance signs, and more than 700 km of cabling. The project also included expanding and upgrading the airfield lighting control and monitoring system.

All Work Coordinated with Civil Construction Activities

The work also included several flight checks to calibrate the PAPI systems and adjustments to the ILS-16L glide slope to align the approach guidance. Existing infrastructure, including approach lighting towers and regulator room 1240, was adapted, and the integrated ATC information system was updated to ensure compatibility with the upgraded Airfield Lighting Control and Monitoring System (ALCMS).

All activities were coordinated with civil construction work, which included rehabilitating runway and taxiway pavement, upgrading runway strips and runway end safety areas (RESAs), building a new service road, installing a fuel pipeline beneath the runway, and constructing a new regulator room.

Shall we talk about your project?

Our team is ready to develop bespoke solutions.

comercial@sampol.com

PREV

3.1 MW Biogas Trigeneration Plant for Bacardí in Puerto Rico

NEXT

Petén Power Plant in Guatemala

Related projects

Imagen Cogeneracion
EnergyTransport
Electrification of the Cogeneration Plant at Adolfo Suárez Madrid-Barajas Airport
Central Eléctrica (ce 3) En El Aeropuerto
EnergyTransport
Power Station (CE-3) at Adolfo Suárez Madrid-Barajas Airport
Ops Valencia (2)
Transport
Installation and Maintenance of the Onshore Power Supply (OPS) System at the Port of Valencia
SAMPOL_logo_blanco

Capital Center Building
South Tower, Suite 1001
239 A. Hostos Avenue
Hato Rey, 00918 Puerto Rico

info@sampol.com
+1 787 504 4013

Links

  • Where we are
  • News
  • Jobs
  • Contact

Enlaces

  • Cookie Policy
  • Terms and Conditions
  • Privacy and Data Protection Policies
  • Information Security Policy
  • Whistleblowing Channel
Linkedin-inYoutubeInstagram
Icono Ens
Sampol Isos