Logo Sampol Bn 02 2
  • HOME
  • SAMPOL’S COMMITMENT
  • PROJECTS
  • TALENT
  • ABOUT SAMPOL
  • NEWS
  • CONTACT
  • English
    • Spanish
    • French
Logo Sampol Bn 02 2
Logo Sampol Bn 02 2
  • HOME
  • SAMPOL’S COMMITMENT
  • PROJECTS
  • TALENT
  • ABOUT SAMPOL
  • NEWS
  • CONTACT
  • English
    • Spanish
    • French
Logo Sampol Bn 02 2
  • HOME
  • SAMPOL’S COMMITMENT
  • PROJECTS
  • TALENT
  • ABOUT SAMPOL
  • NEWS
  • CONTACT
  • English
    • Spanish
    • French
Balizamiento De La Pista 16l 34r Del Aeropuerto Internacional Jorge Chávez

Airfield Lighting for Runway 16L-34R at Jorge Chávez International Airport

sector:

Transport

date:

2025 – 2026

Location:

Lima, Peru

Services:

Integrated MEP & Technology Systems Contracting / Control and Automation Integration

Full upgrade of the CAT III visual aids on Runway 16L-34R

The project involved dismantling the existing systems and installing new visual aids on Runway 16L-34R and its associated taxiways. The work included 2,251 lights, 37 constant-current regulators, four high-voltage selectors, two PAPI systems, and more than 700 km of cabling.
CAT III approach lighting systems were installed, along with threshold identification lights, sequential flashing approach lights, and internally illuminated signs for vertical guidance. The scope also included expanding and upgrading the Airfield Lighting Control and Monitoring System (ALCMS).

Aeropuerto 02 892x740
Aeropuerto 01 892x740
Aeropuerto 03 892x740

System calibration and integration coordinated with civil works

The work included calibration flights for the PAPI systems and adjustments to the ILS-16L glide path to ensure compatibility with the approach. The approach lighting towers and regulator room 1240 were also upgraded, and the Integrated ATC Information System was updated to ensure compatibility with the enhanced ALCMS.
The work was coordinated with the runway and taxiway pavement rehabilitation, runway strip and RESA upgrades, construction of a service road, installation of a fuel pipeline beneath the runway, and construction of a new regulator room.

Shall we talk about your project?

Our team is ready to develop bespoke solutions.

comercial@sampol.com

PREV

Building Systems for the H10 Coral Spring Resort Complex in Jamaica

NEXT

Electrical Installations at the Secrets Dreams Costa Esmeralda Hotel in the Dominican Republic

Related projects

Central Eléctrica (ce 3) En El Aeropuerto
EnergyTransport
45/15 kV CE-3 Power Plant at Adolfo Suárez Madrid-Barajas Airport
Imagen Cogeneracion
EnergyTransport
Electrification of the cogeneration plant with two 10 MW boilers at Adolfo Suárez Madrid-Barajas Airport
Torre Palmerola
Transport
Control Tower (TWR) and Fire Station at Palmerola International Airport
SAMPOL_logo_blanco

Capital Center Building
South Tower, Suite 1001
239 A. Hostos Avenue
Hato Rey, 00918 Puerto Rico

info@sampol.com
+1 787 504 4134

Links

  • Where we are
  • News
  • Jobs
  • Contact

Enlaces

  • Cookie Policy
  • Terms and Conditions
  • Privacy and Data Protection Policies
  • Information Security Policy
  • Whistleblowing Channel
Linkedin-inYoutubeInstagram
Icono Ens
Sampol Isos