Logo Sampol Bn 02 2
  • HOME
  • SAMPOL’S COMMITMENT
  • PROJECTS
  • TALENT
  • ABOUT SAMPOL
  • NEWS
  • CONTACT
  • English
    • Spanish
    • French
Logo Sampol Bn 02 2
Logo Sampol Bn 02 2
  • HOME
  • SAMPOL’S COMMITMENT
  • PROJECTS
  • TALENT
  • ABOUT SAMPOL
  • NEWS
  • CONTACT
  • English
    • Spanish
    • French
Logo Sampol Bn 02 2
  • HOME
  • SAMPOL’S COMMITMENT
  • PROJECTS
  • TALENT
  • ABOUT SAMPOL
  • NEWS
  • CONTACT
  • English
    • Spanish
    • French
Opsibiza

Medium- and Low-Voltage OPS System for Vessels at the Port of Ibiza

sector:

Transport

date:

2024

Location:

Ibiza, Spain

Services:

Integrated MEP & Technology Systems Contracting

Shore-side power supply for vessels at the Port of Ibiza

An OPS (Onshore Power Supply) system was installed at the South Botafoc Pier at the Port of Ibiza to supply electricity to vessels while they are in port. The project included extending the 15 kV medium-voltage grid and installing two transformer stations, CT-OPS North and CT-OPS South, each equipped with a 1,000 kVA, 15/0.5 kV transformer.
The infrastructure also includes a transformer-converter substation on each pier alignment, power ducts and cabling to the quayside connection points, and installations designed to supply vessels at both low voltage (400 V) and medium voltage (11 kV), at frequencies of 50 and 60 Hz.

Opsibiza02.jpg
Opsibiza01.jpg
Opsibiza03.jpg

Infrastructure designed for ferries and fast ferries with different power requirements

The system was designed to serve fast ferries requiring up to 800 kW through a 400 V low-voltage connection, as well as ferries requiring up to 1,600 kW through an 11 kV medium-voltage connection. This configuration enables the infrastructure to serve different types of vessels flexibly and scale to their requirements.
The work was carried out along the North and South alignments of the South Botafoc Pier, serving berths 3 and 4. Connecting vessels to shore-side power helps reduce emissions, noise, and vibration in the port by allowing them to switch off their onboard auxiliary generators while berthed.

Shall we discuss your project?

Our team is ready to develop tailored solutions.

comercial@sampol.com

PREV

Technology Modernisation at the Royal Hideaway Farah Casablanca Hotel

NEXT

Hotel Installation Upgrades and Digitalisation at Bahía Príncipe Tulum in Mexico

Related projects

Central Eléctrica (ce 3) En El Aeropuerto
EnergyTransport
45/15 kV CE-3 Power Plant at Adolfo Suárez Madrid-Barajas Airport
Tocumen
EnergyTransport
23 MW Backup Power Plant at Tocumen International Airport
Imagen Cogeneracion
EnergyTransport
Electrification of the cogeneration plant with two 10 MW boilers at Adolfo Suárez Madrid-Barajas Airport
SAMPOL_logo_blanco

Capital Center Building
South Tower, Suite 1001
239 A. Hostos Avenue
Hato Rey, 00918 Puerto Rico

info@sampol.com
+1 787 504 4134

Links

  • Where we are
  • News
  • Jobs
  • Contact

Enlaces

  • Cookie Policy
  • Terms and Conditions
  • Privacy and Data Protection Policies
  • Information Security Policy
  • Whistleblowing Channel
Linkedin-inYoutubeInstagram
Icono Ens
Sampol Isos