2025 – 2026
Canary Islands, Spain
EPC (Engineering, Procurement & Construction), Operation and Maintenance
The project is a plan to provide backup power for electrical emergencies in Tenerife and Fuerteventura, with a total backup capacity of 60 MW.
It comprises the La Herradura and Puerto de Santa Cruz power stations, each with a capacity of 18 MW, Los Realejos with a capacity of 15 MW, and La Campana with a capacity of 9 MW. Key factors in ensuring the security of the electricity supply in the island’s electricity systems.
This project was developed in response to the threat of power cuts caused by ageing power stations.