6.7 MW Behind-the-Meter Combined Heat and Power Plant for Kenvue in Puerto Rico
sector:
Energy
fecha:
2024
Location:
Las Piedras, Puerto Rico
Services:
EPC — Engineering, Procurement & Construction / Operation and Maintenance
6.7 MW of cogeneration and 13.2 t/h of steam for Kenvue
Kenvue’s Behind-the-Meter cogeneration plant in Las Piedras, Puerto Rico, was commissioned in 2025 to supply its pharmaceutical and industrial facilities, reduce emissions and energy costs, and improve the reliability of its power supply. The plant includes two natural gas reciprocating engines with a total electrical capacity of 6.7 MW.
Heat recovered from the exhaust gases is used to produce steam, while heat from the cooling circuits is used to generate hot water. An auxiliary boiler supplements steam production, bringing total capacity to 13.2 t/h. SAMPOL’s scope included the design, investment, full EPC delivery, and operations and maintenance (O&M) under a PPA / Energy-as-a-Service (EaaS) contract.
Five days of fuel autonomy and an estimated 44% reduction in carbon footprint
The plant normally operates in parallel with the public grid and can switch to island mode if external power supply is disrupted. On-site LNG storage and regasification facilities provide five days of fuel autonomy, strengthening continuity of service.
Compared with the client’s previous situation, project documentation estimates a 44% reduction in carbon footprint and a 25% reduction in energy costs.