Energy
2023–2024
Madrid, Spain
Integrated MEP & Technology Systems Contracting
The project involved modernizing the district heating system at Complutense University of Madrid’s Moncloa campus. The work included building a new hot water distribution network and renovating the heating substations, with new connections to faculty and classroom buildings.
The network was built using pre-insulated steel pipes installed underground between the central heating plant and the substations to minimize heat loss during hot water distribution. The scope covered 17 heating substations serving 26 buildings.
The upgrades included heat exchangers, pumps, electrical panels, lighting, thermal insulation, and centralized controls. The new network and substations improve hot water distribution and temperature control, enhancing occupant comfort and reducing energy consumption.
The work took 18 months and was completed on schedule to provide heating to the campus starting November 1, 2024.