Energy
2019–2024
Mexico
EPC — Engineering, Procurement & Construction / Engineering and Design
The project involved the turnkey delivery of Phase II of Unión Energética del Noroeste’s (UEN) power plant in Agua Prieta, Sonora. The facility added an 11,020 kW Rolls-Royce natural gas engine generator and a 1,400 kW Organic Rankine Cycle (ORC) turbine designed to recover heat from the exhaust gases of the engines installed in Phases I and II.
SAMPOL handled the design, supply, transportation, installation, and commissioning of the electrical and mechanical equipment. The scope included civil works, cooling and heat recovery systems, medium- and low-voltage electrical installations, and the control system.
The ORC system included a thermal oil boiler, heat exchangers between the oil and the organic working fluid, a turbine, and a condensing system. This technology recovered waste heat from the engines to generate electricity without additional fuel consumption, increasing the plant’s overall efficiency.