Energy / Transport
2019 – 2024
Madrid, Spain
Integrated MEP & Technology Systems Contracting
A new power plant is being built at the largest airport in the AENA network. It is designed to replace three existing substations and ensure both normal and emergency power supply to Terminals 1, 2, and 3, as well as future expansions.
The plant will centralise part of the airport’s current power distribution. It will have three 45 kV incoming supply lines and step the voltage down to 15 kV to feed the distribution network, which includes 300,000 metres of cable and serves 20 transformer centres. The installation will include three 15/20 MVA power transformers and approximately 189 medium-voltage switchgear cubicles.
For emergency power supply, the plant will include four 4 MVA generator sets, with provision to add two more sets of the same capacity in the future. The generator sets will produce electricity at 6 kV, so each will be paired with a step-up transformer to raise the voltage to 15 kV.