Energy / Transport
2019 – 2024
Madrid, Spain
Integrated MEP & Technology Systems Contracting
Construction of a new power station at the main airport in the AENA network. The facility is designed to replace three existing substations and ensure both normal and emergency power for Terminals T1, T2, and T3, as well as future expansions.
The project will centralize part of the airport’s existing electrical distribution system. The station will have three incoming 45 kV feeds and step the voltage down to 15 kV to supply distribution lines serving 20 transformer substations. The work includes installing 300,000 meters of cable, three 15/20 MVA power transformers, and approximately 189 medium-voltage switchgear cubicles.
For emergency power, the station will have four generator sets rated at 4 MVA each, with provisions for two additional units of the same capacity. Each generator will produce electricity at 6 kV and will be paired with a step-up transformer to raise the voltage to 15 kV.