Logo Sampol Bn 02 2
  • HOME
  • SAMPOL’S COMMITMENT
  • PROJECTS
  • TALENT
  • ABOUT SAMPOL
  • NEWS
  • CONTACT
  • English
    • Spanish
    • French
Logo Sampol Bn 02 2
Logo Sampol Bn 02 2
  • HOME
  • SAMPOL’S COMMITMENT
  • PROJECTS
  • TALENT
  • ABOUT SAMPOL
  • NEWS
  • CONTACT
  • English
    • Spanish
    • French
Logo Sampol Bn 02 2
  • HOME
  • SAMPOL’S COMMITMENT
  • PROJECTS
  • TALENT
  • ABOUT SAMPOL
  • NEWS
  • CONTACT
  • English
    • Spanish
    • French
Central Eléctrica (ce 3) En El Aeropuerto

Power Station (CE-3) at Adolfo Suárez Madrid-Barajas Airport

sector:

Energy / Transport

date:

2019 – 2024

Location:

Madrid, Spain

Services:

Integrated MEP & Technology Systems Contracting

Construction of a New Power Station at Adolfo Suárez Madrid-Barajas Airport

Construction of a new power station at the main airport in the AENA network. The facility is designed to replace three existing substations and ensure both normal and emergency power for Terminals T1, T2, and T3, as well as future expansions.

The project will centralize part of the airport’s existing electrical distribution system. The station will have three incoming 45 kV feeds and step the voltage down to 15 kV to supply distribution lines serving 20 transformer substations. The work includes installing 300,000 meters of cable, three 15/20 MVA power transformers, and approximately 189 medium-voltage switchgear cubicles.

Central 01
Central 02
Central 03

Power Infrastructure for Airport Operations

For emergency power, the station will have four generator sets rated at 4 MVA each, with provisions for two additional units of the same capacity. Each generator will produce electricity at 6 kV and will be paired with a step-up transformer to raise the voltage to 15 kV.

Shall we talk about your project?

Our team is ready to develop bespoke solutions.

comercial@sampol.com

PREV

Four Emergency Power Plants in the Canary Islands — Atlante Project

NEXT

3.1 MW Biogas Trigeneration Plant for Bacardí in Puerto Rico

Related projects

CooperVision plant developed by SAMPOL
Energy
23.3 MW Off-Grid Microgrid for CooperVision in Puerto Rico
Default
Energy
Petén Power Plant in Guatemala
Sampol Janssen Cogeneration
Energy
6.75 MW Behind-the-Meter Microgrid for Janssen (Johnson & Johnson) in Puerto Rico
SAMPOL_logo_blanco

Capital Center Building
South Tower, Suite 1001
239 A. Hostos Avenue
Hato Rey, 00918 Puerto Rico

info@sampol.com
+1 787 504 4134

Links

  • Where we are
  • News
  • Jobs
  • Contact

Enlaces

  • Cookie Policy
  • Terms and Conditions
  • Privacy and Data Protection Policies
  • Information Security Policy
  • Whistleblowing Channel
Linkedin-inYoutubeInstagram
Icono Ens
Sampol Isos