Energy
2024 – 2026
Roatán, Honduras
EPC (Engineering, Procurement & Construction)
The project involves the engineering, construction and commissioning of a power station and includes the installation of three Bergen B36:45V20AG engines fuelled by propane, with a total electricity generation capacity of 25,245 kW to meet the island’s growing demand for electricity.
The plant is based on Liquefied Petroleum Gas (LPG) technology and, with a capacity of 25 MW, represents a significant step forward in the modernisation of the island’s energy infrastructure, helping to improve the reliability of the system and meet growing demand.