Engineering and Design
The project involved developing the ready-to-build engineering for a 101 MW power plant for Kiwetinohk in Fox Creek, Alberta, Canada. The plant is configured with nine 11.2 MW natural gas reciprocating engines.
The technical design covered the auxiliary equipment, a 138 kV high-voltage substation, and a gas metering and regulating station. It also included integration with a planned CO₂ capture facility to separate and recover carbon dioxide from the exhaust gases, defining the technical interfaces between power generation and the capture infrastructure.
The engineering took into account the operating requirements and auxiliary systems needed in a region where winter temperatures can fall below −40°C and summer highs can exceed 30°C. These environmental conditions were factored in from the design stage.