Energy
2025 – 2026
Canary Islands, Spain
EPC — Engineering, Procurement & Construction / Operation and Maintenance
The Atlante Project involved the design and construction of four emergency power plants in the Canary Islands, with a combined capacity of 60 MW. The plants are located at La Herradura, with 18 MW; Puerto de Santa Cruz, with 18 MW; Los Realejos, with 15 MW; and La Campana, with 9 MW.
The four independent plants provide backup power to strengthen the security of the island electricity supply in the event of disruptions to the power system. This capacity is available when required by the system operator, meeting emergency needs while other long-term generation infrastructure is developed.
SAMPOL provided the investment and full EPC delivery for the project, as well as the operations and maintenance of the plants, under an independent power producer (IPP) model. The facilities were commissioned during the 2025–2026 period.